Synthetic Pitch Installations by SIS - UK & Europe

Newcastle Falcons - Newcastle - Full size IRB Rugby
This full size synthetic rugby pitch was designed and built by SIS and opened in September 2007. The pitch was built to IRB standards and includes a shock pad system. The carpet installed was the SIS Supreme MF.

Queens Park FC - Glasgow - Full size FIFA 2 star pitch*
Design and build of this full size artificial pitch to FIFA 2 star specification. Installation of Schmitz shock pad system.

*SIS is the European Distributor for Team Sports who are FIFA licensees.

Powerleague - Milton Keynes - New 12 pitch complex
Design and build 10 five a side pitches, 1 seven a side pitch and 1 MUGA. This complex is built on a school site in conjunction with the school. The carpet installed is from SIS Mfg. SIS has introduced there new 'Synergigue' product which allows both football and hockey to be played on the same surface.

Powerleague - Cardiff - New 10 pitch complex
Design and build 10 five a side pitches on a school site in Cardiff. The carpet installed is SIS Superior. The site was completed in 12 weeks and was opened in 2007.

Play Football - Swansea - New 10 pitch complex
Design and build 8 five a side pitches and 1 seven a side pitch. This complex is built on a school site in conjunction with the school. The carpet installed is from SIS Mfg.

Durham AFC - Durham - Full Size Synthetic Pitch
This SIS built full size synthetic football pitch has exceeded the ISA and FA Community standard, and is used by professional and amateur football players. The pitch was installed on a new shock pad system from Schmitz, Dutch Company. The carpet is a unique combination of monofilament and monotape fibres which provides improved playability and enables the fibres to remain standing. This product which is produced in the SIS owned factory is called the Supreme.

Powerleague - Coventry - New 10 pitch complex
Design and build 8 five a side pitches and 1 seven a side pitch. This complex is built on a school site in conjunction with the school. The carpet installed is from SIS Mfg. The new pitches are available for the school during the day time and Powerleague use in the evening and weekends. Total Area (6,000m2) the site opens in April 2006.

Play Football - Crosby - New 8 pitch complex
Design & build a new eight pitch complex with six five a sides and one seven a side pitch. SIS installed their unique high safety fencing system. Project includes supply and installation of fencing and lighting. Project completed on time and on budget. Total Area (4,800m2).

Play Football - Portsmouth - Synthetic five a sides
Installation of SIS Superior 50mm XPS carpet to enhance existing site at Portsmouth. New fencing system installed by SIS to improve safety of complex.

Play Football - Luton - Synthetic 5 a side complex
Design and build new five a side centre Total (6,200 m2) New SIS Mfg carpet installed in first new centre built for Play-Football. Floodlighting and fencing installed to SIS design. Project completed ahead of schedule in December 2005 and on budget.

Astley Sports College - Astley - Full size Hockey Returf
Removal of existing synthetic hockey pitches (8,000 m2). Carpet stripped and removed from site. Partial replacement of in-situ shock pad. Installation of 24mm. Project completed on time and budget.

Powerleague - Halesowen - Synthetic 5 a side complex
Design and build new five a side centre. Convert existing amateur football pitch into 6 five a sides & 1 seven a side pitch complex. Total (6,200 m2) Removals of old pitch, create new levels, install new basement & sub base. Project completed on time and on budget.

Powerleague - Croydon - Synthetic Rugby pitch
New pitch installed with 65mm fibre for rugby and football. Basement and sub-base designed to ensure more protection for rugby players. Sand & rubber infill utilising Sandmatic machine. Unique fencing designed and installed on site Floodlighting installed on site. Project completed on time and on budget. Total Area (5,800m2)

Goals - New Malden - New 10 pitch complex
Build to specific design 10 five a side pitches & 1 seven a side pitch. This product is a monofilament, 100% spinneret yarn, allows fibres to stay in shape. Project includes supply and installation of fencing and lighting.

Powerleague - Kilmarnock - New 8 pitch complex
Design & build a new eight pitch complex with six five a sides and one seven a side pitch. SIS installed their unique high safety fencing system. Project includes supply and installation of fencing and lighting. Project completed on time and on budget. Total Area (4,800m2)

Soccarena - Durham - Indoor Football pitches
Installation of indoor football pitches (6000m2). Carpet supplied is 50mm slit film synthetic carpet. This carpet is hard wearing and suited to intensive five a side football. SIS provided a removable fencing system to allow the site to have one 6000m2 pitch.

Powerleague - Watford - New 10 pitch complex
Design and build 8 five a side pitches and 1 seven a side pitch. This complex is built on a school site in conjunction with the school. The new pitches are available for the school during the day time and Powerleague use in the evening and weekends. Total Area (6,000m2)

Willem II FC - Netherlands. Full size synthetic pitch
Design and build the first synthetic football pitch in Europe with electrical under soil heating. The client requirement was for an ISA-SPORT approved pitch with an electrical heating system. SIS sourced and worked with a company from Norway to develop the heating system. Total Area (8,000m2)

Almere Sport Park - Netherlands - 2 Full size synthetic pitches
The first two Fieldturf ISA-SPORT artificial pitches to be installed in the Netherlands were carried out by SIS. The project included design, installation of two full size synthetic pitches with fencing and floodlighting. Project completed on time and on budget. Total Area (14,600m2)

Powerleague - Fairlop Oak - 2 seven a side pitches
Two new seven a side football pitches built adjoining existing five a side complex. Designed and built by SIS. New fencing design to increase protection of players. Project completed on time and on budget. Total Area (2400m2)

Powerleague - Liverpool - 10 five a side pitches
Replacement of 10 sand filled artificial pitches with 10 sand and rubber filled pitches. Pitches were in filled using purpose built Sandmatic machine to ensure even distribution to sand and rubber. Project completed on time and on budget. Total Area (8800m2)

Powerleague - Gateshead - Two 5 a side pitches
Replacement of 2 five side sand filled artificial pitches with 2 five a side sand and rubber filled pitches. Pitches were in filled using purpose built Sandmatic machine to ensure even distribution to sand and rubber. Total Area (1,560)

Powerleague - Glasgow - Five 5 a side pitches
Replacement of 5 five side sand filled artificial pitches with 5 five a side sand and rubber filled pitches. Pitches were in filled using purpose built Sandmatic machine to ensure even distribution to sand and rubber. Project completed in 20 working days. Total Area (3520m2)

FC Schalke04 - Germany - Synthetic Sidelines
Installation of synthetic turf with EPDM green rubber on football surrounds. The natural grass pitch is a unique sliding pitch designed by SIS. The green EPDM rubber was installed to ensure a more complete finish in line with this state of the art stadium. Artificial turf used for surrounds of pitch.

Galway Hibernians - Ireland - Synthetic Pitch
Complete new build installation for Galway Hibernians. The pitch was built on an old landfill site and the construction was with stone and tarmac. Installation of SIS fencing system. Project completed in October 2005.

Boyle Celtic - Ireland - Synthetic Pitch
Purpose builds seven a side football pitch on green field site. Pitch size is 50 * 35. The pitch works include, removal of top soil, excavation, drainage, stone base, carpet, fencing and lighting. Maintenance program provided by SIS (IRL) Ltd. Total Area (1,750m2)

Ransboro - Ireland - Synthetic Pitch
Carpet supplied from SIS (Mfg) Ltd. Site completed in October 2005.

Powerleague - Sheffield - Four 5 a side pitches
Replacement of 8 five side sand filled artificial pitches with 4 five a side sand and rubber filled pitches. Pitches were in filled using purpose built Sandmatic machine to ensure even distribution to sand and rubber. Project completed in 14 working days & in budget. Total Area (3,400m2)

Raw Soccer - Lowestoft - One indoor football pitch
Installation of new indoor football pitch at Lowestoft. Introduction of new slit film synthetic carpet for the first time in the UK. Sandmatic used to infill carpet and Sportschamp to complete carpet.

Play Football - Blackpool - Eight 5 a side synthetic pitches
Replacement of 8 five side sand filled artificial pitches with 8 five a side sand and rubber filled pitches. Pitches were in filled using purpose built Sandmatic machine to ensure even distribution to sand and rubber. Project completed in 14 working days & in budget. Total Area (6,600m2)

Play Football - Preston - Eight 5 a side synthetic pitches

Replacement of 8 five side sand filled artificial pitches with 8 five a side sand and rubber filled pitches. Four pitches indoor. Pitches were in filled using purpose built Sandmatic machine to ensure even distribution to sand and rubber. Project completed in 16 working days & in budget. Total Area (6,200m2)

Powerleague - Basingstoke - New 10 pitch complex
Design and build new 8 five a side pitches & 1 seven a side pitch. Project includes supply and installation of fencing and lighting. SIS completed all civil works on the site. Project completed on time and on budget. Total Area (6,000m2)

Hassockfield - Durham - New synthetic pitch
New purpose build pitch for Hassockfield high security prison.

Aclare - Sligo - New synthetic pitch
Purpose built seven a side pitch with 3G sand and rubber infill synthetic carpet. Project included fencing and lighting.