Lucozade Powerleague Yardley, Birmingham (Synthetic Turf)
Design and build 6 five a side pitches and 1 seven a side pitch. The project included fencing, floodlighting and the installation of SIS Superior 50 3G surface. New car park works were constructed with tarmacadam and gravel parking bays, with the refurbishment of existing car park. Pictured right: Bob Taylor Operations Director SIS and (left) Tony Scott, Development Manager Lucozade Powerleague.