Lucozade Powerleague Leeds Central (Synthetic Turf)
Design and build 5 five a side pitches and 1 seven a side pitch. The development of a removable fence system has been devised with installation of fencing, floodlighting and additional synthetic pathway carpet. SIS Slide 50 long pile fibrillated 3G synthetic surface will be installed with sand/rubber infill. The construction of new car park and entrance way will complete the project.









