Amsterdam ArenA, Netherlands (Natural Turf)
SIS is responsible for installing new pitches at this multi functional stadiumĀ since 2000 and the contract is ongoing. The Amsterdam returf was carried out on July 16th and was completed in 18 hours. A total of 20 trucks delivered the turf from Amsterdam. The pitch was played on within 48 hoursĀ of the installation.